Drill Master 94436 User Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
SimpleLine ll Surgical / Prosthesis Manual
25
Fixture Level
[
Transfer Type
]
-
Dual Abutment
Completion of wax-up. Metal framework. Final prosthesis build-up on the
framework with porcelain.
Use the positioning jig to transfer the
abutment from the model to the intraoral
and tighten it with 25~30Ncm.
Re-tighten after 15 minutes.
Cement the final prosthesis and make
occlusal adjustment. Place wax into the
opening of the abutment to protect the
screw head prior to the composite
sealing.
Create an access hole for the pick-up
coping screw.
Completion of Wax-up. Metal framework.
SCRP- Lab Side
Final prosthesis. Use positioning jig to transfer
abutment from the model to the intraoral
and tighten it with 25~30Ncm.
Re-tighten after 15 minutes.
* In the process of seating the prosthesis, the components can be rebounded by gingival tissue.
In that case, it is advised to apply occlusal load on the prosthesis for 10~15 minutes.
Cement the final prosthesis and make
occlusal adjustment. Place wax into the
opening of the abutment to protect the
screw head prior to the composite
sealing.
Chairside
SCRP- Chairside
[
Multiple Units
]
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 47 48

Comments to this Manuals

No comments